MuskokaONline.com News - #GOTLOCAL

Hamlet Bridge On Track To Re-open In The Fall

Posted: 2019-08-07 07:52:10 By: hbr

Canada Parks says there will be increased truck traffic in the area of the Hamlet Bridge near Gravenhurst this week on the South-West side of the Trent-Severn Waterway, as sections of the swing portion of the new Hamlet Bridge begin to arrive onsite.

Completion timelines for the new bridge remain in the fall with intermittent closures in spring 2020 for commissioning and testing operation in warmer temperatures.


​